Click the links below to view
26008-BDB-SW-XX-DR-CE-0001 – Drainage and Watermain Network Layout
26008-BDB-SW-XX-DR-CE-0002 – SuDS Strategy Layout and Details
26008-BDB-XX-XX-DR-CE-0003 – Storm Sewer Longsections
26008-BDB-XX-XX-DR-CE-0004 – Foul Sewer Longsections
26008-BDB-XX-XX-DR-CE-0005 – Standard Drainage Details (Sheet 1 of 2)
26008-BDB-XX-XX-DR-CE-0006 – Standard Drainage Details (Sheet 2 of 2)
26008-BDB-XX-XX-DR-CE-0007 – Watermain Standard Details
26008-BDB-XX-XX-DR-CE-0008 – Vehicle Tracking (Autotrack) Drawing
26008-BDB-XX-XX-DR-CE-0009 – Road Safety Audit Response Drawing
Engineering Drawing Issue Slip – 24-07-2026
